Background

how many tonnes of line needed for cement

Concrete Calculator | Volume Calculator | Concrete2you

Our concrete calculator allows you to accurately work out the amount of concrete you'll need for your project. Simply add the measurements for your concrete order to the relevant shapes above (you only have to fill in the shape/s you want to use) You can build up a concrete calculation for complicated areas by adding additional shapes of each type.

STONE CALCULATOR [How Much Stone do I Need] - …

Let's say I need crushed gravel for part of my driveway which measures 4ft long, 2ft wide and 9in (0.75ft) deep. Let's also say that the selected gravel costs $50 per ton . I would enter these measurements for length, width, depth and density which would then perform the following calculation to work out the cost for covering the section of ...

Cement Storage Silo - Zimmerman Industries, Inc.

Since cement is usually loaded pneumatically, the amount of air that is integrated in the cement must be accounted for to avoid overfilling of the silo. The following data can be used to determine the silo capacity needed. 1 Barrel of Cement = 300 lbs of blown in, or "fluffed" cement. 200 Barrel Silo – Loaded Capacity of 60,000 lbs / 30 tons

Concrete Calculator - How Much Do I Need? | CEMEX UK

Use the Readymix Concrete Volume Calculator to calculate the volume of concrete you require for your job. If you are not sure of how to calculate the volume of different shapes, you can use the Common Shape Calculator which will provide you with the appropriate equations. *1m³ minimum order value. 1. Calculate your volume. 2. Choose your project.

Production Rate Table

Item. Unit. Expected Production Range (1) Concrete Masonry, Bridges (Foundation Substructure) CY/DAY. 15 - 32, 19 typ. Parapet LF/DAY; 49 - 130, 60 typ.

DIY Conversion Tables and Conversion Information | DIY Doctor

1.44 tonnes per cubic metre: Ballast = 1.76 tonnes per cubic metre: gravel (MOT Type 1 scalpings) = 1.92 tonnes per cubic metre: shingle = 1.62 tonnes per cubic metre: cement = 50 & 25 kg bags: stiff clay = 1.6 tonnes per cubic metre: loam = 1.28 tonnes per cubic metre: peat (wet) = 0.96 tonnes per cubic metre: peat (dry) = 0.8 tonnes per cubic ...

On Making 1 Ton Of Cement How Many Clinker In Ton Needed

On making 1 ton of cement how many clinker in ton needed figure 1 cement production process flow schematic and typical energy efficiency measures clinker can be produced in many different pyroprocessing production step requiring about 25 to 35 kilowatt hours kwh per ton of raw material, although it could require as little as 11wh per ton.

Weighted Cement Calculations - Formulas and Calculations ...

Determine the number of sacks of TAIL or NEAT cement required: Sacks required annulus = 1000ft x 0.6946ft3/ft x 1.50 + 1.15ft3/sk Sacks required annulus = 906. Sacks required casing = 44ft x 0.8679ft3/ft + 1.15ft3/sk Sacks required casing =33. Total sacks of TAIL cement required: Step 4. Determine the barrels of mud required to bump the top plug:

How To Estimate The Amount Of Cement Mortar Required To ...

So you can order 20 tonnes of sharp sand and 57 bags of cement for this job. Now i am sure you understand How to estimate the amount of mortar Required To Lay Blocks (Cement and Sand) covering one square metre as well as make estimates for cement mortar.

How much clinker is required to make one ton of cement ...

Answer: Portland cement clinker is the material that gets ground up (possibly with gypsum and other small quantities of material) to become Portland cement. Clinker is in the form of rounded granules, typically 3 to 25mm diameter. Those granules are the sintered output from large rotary kilns. ...

Concrete Slabs Calculator - Lowe's

Concrete Slabs Calculator. Input length, width and depth of the area. Click the button to calculate the volume of concrete and man-hours (not including mixing) needed for this job. This calculator is to be used as an estimating tool only. Shop Concrete Mix.

How to calculate the numbers of bags of cement in the ...

Divide volume of concrete by 10 to get the required volume of cement in concrete. i.e 4.894/10=0.4894 for volume of cement. Don't forget we are taking the volume of one bag of cement as 0.03, Then divide 0.4894m3 by 0.03m3 =16 bags of cement (this is most applicable on good and fairly stable soil.

Concrete Calculator

While there are many types of cement, Portland cement is the most commonly used cement, and is an ingredient in concrete, mortar, and plasters. Concrete can be purchased in multiple forms, including in 60 or 80-pound bags, or delivered in large amounts by specialized concrete mixer trucks. Proper mixing is essential for the production of strong ...

Asphalt Calculator - How much asphalt do you need?

When calculating asphalt weight, make sure you do not confuse tonne (metric ton) with ton (short ton). The first is used by all countries in the world, except the U.S. and is defined to be equal to 1000 kg by the international body of standardization. The ton is currently only used in the United States and is equal to 2000 pounds (2000 lbs).

Gravel Calculator | How many tons do I need?

How many tons of gravel do I need? This calculator solves for the cubic yards but returns the number of tons based on 2,800 lbs. per yard. Round up to the nearest foot in the length and width boxes, and the same thing just use inches in the depth box to instantly get a …

Concrete Calculator - Estimate Cement, Sand, Gravel ...

Example calculation Estimate the quantity of cement, sand and stone aggregate required for 1 cubic meter of 1:2:4 concrete mix. Ans. Materials required are 7 nos. of 50 kg bag of cement, 0.42 m 3 of sand and 0.83 m 3 of stone aggregate.

Here Is How Many Bags of Cement You Can Get From a Tonne ...

The article explains how a tonne of cement translate to a bag of cement. This is important info for any analysts. Cement is often purchased in tonnes and when converted, one tonne of cement is equal to 1000 killogrammes of the product. So basically, a tonne of cement will produce about 20 50kg bags of cement.

Cement Production - an overview | ScienceDirect Topics

The decarbonation of limestone to give the calcium required to form silicates and aluminates in clinker releases roughly 0.53 t CO 2 per ton of clinker [8]. In 2005, cement production (total cementitious sales including ordinary Portland cement (OPC) and OPC blends) had an average emission intensity of 0.89 with a range of 0.65–0.92 t CO 2 ...